Written so anyone can follow — make your first bid in about an hour.
A bid is a paper that tells a customer how much money it will cost to do their job. Think of it like a price ticket for a big project.
When someone wants to build something — a school, a hospital, a train station — they ask companies like TotalBidder to send a bid. The customer reads all the bids that come in and picks one.
Your job is to make the bid right. TotalBidder helps you do that. This guide walks you through it from the very first click.
TotalBidder does not count devices from drawings. Somebody — you, an estimator, a takeoff service — has already walked the plans and written down every device and every cable run. TotalBidder's job starts there: it takes your completed count, prices it, and builds the bid.
Three things to have ready:
Have a wage determination (Davis-Bacon or a state prevailing-wage decision)? Keep that handy too — it goes in the same upload spot as your take-off.
Got what you need? Good. Let's go.
At the top of the screen, look at the big toolbar. Find the button that says .
Click it. A blank bid opens. The screen changes to a form with lots of boxes.
You'll see a list of boxes. Take your time. Fill in each one:
| Box | What to type |
|---|---|
| Project Name | What the job is called. Example: Sutter Health TI Building C |
| Project Location | Where the building is. Example: Sacramento, CA |
| Prepared For | The company asking for the bid. Example: Turner Construction |
| Bid Due Date | When the bid must be done. Click the calendar and pick the day and time. (This one matters — it powers the deadline reminders below.) |
| Estimator | Your name. Pick from the drop-down list. |
| Salesperson | The TotalBidder salesperson on the deal. Pick from the list. |
Below that, you'll see boxes called Disciplines. These are the kinds of work the job needs. Check ONLY the ones that match your job:
Click Next at the bottom of the page. You'll see a box called Upload Take-off Data — this is the heart of the new workflow.
Any reasonable column layout works — Item, Qty, Unit, Unit Cost, Mfg, Part #, Cable Length. TotalBidder finds the columns itself; it doesn't need an exact template.
Got a wage determination (Davis-Bacon or a state prevailing-wage decision)? Drop that in the same box — TotalBidder tells take-off files and wage documents apart automatically and reads each one the right way.
Click Next again. You'll see a separate box for the specification book — this is unrelated to the take-off upload and still works the same way it always has.
Click it, find your specs PDF, click Open. TotalBidder reads it and auto-fills project info (owner, dates, prevailing wage, disciplines, code jurisdiction) so you don't have to type it twice.
Click Next until you see the button light up at the top of the page.
Click BUILD BID.
TotalBidder takes the quantities and cable lengths straight from your take-off upload and:
This is fast — there's no drawing analysis to wait on, since the counting was already done in your file. When it's done, you'll see a green message and move straight to the Results / Workbench screen.
Now the most important part. You see the results, and YOU double-check that the priced BOM matches your take-off. TotalBidder never changes your quantities, but a column it read wrong or a price it couldn't find will show up here — that's why a person always checks.
Click the button at the top. A big window opens with tabs on the left side. Visit each tab in order:
A summary of everything. Look at:
A one-page printable summary. Read it. If anything looks wrong, fix it on the regular wizard steps.
Tells you what's IN the job and what's NOT.
Lists things that could go wrong later and cost extra money. Click Auto-Detect from Spec to get the robot's list, then add anything YOU noticed that worries you (a short description, how likely it is, a dollar guess, and how you'd fix it).
Shows ways to make the bid cheaper. Click Generate from BOM — the robot suggests swaps like "use a cheaper camera here." Keep the good ones, delete the bad ones.
If you know what other companies are bidding, type their prices here. TotalBidder shows if you are LOW, MID, or HIGH compared to them.
These tabs — Schedule, Procurement, Project Checklist, Submittals — are for after the bid is won. Don't worry about them yet.
When you're done checking, close the Workbench with the X in the top right.
Always save before you walk away.
TotalBidder auto-saves every few minutes, but you can also click the button at the top to save on purpose. You'll see "Saved at 2:34 PM" in the corner when it works.
When you think your bid is done, the manager (Tony) needs to look at it before you send it.
For really big bids — or any public-works job — use the Approval Chain (Admin → Compliance & Workflow → Approval Chain). It has four rows: Estimator → Tony → Allan → President. Each person changes their row to Approved as the bid moves up. The header reads IN REVIEW (yellow) until everyone signs off, then turns APPROVED (green).
Almost done. Two steps.
Some GCs want their bid back on their own form, not a fresh proposal. On the Results screen, look for the Customer Bid Form card. Drag in their PDF (or a scan of it), and TotalBidder fills it with your real numbers — project info, total base bid, alternates, license/DIR numbers, addenda — right onto their original pages. Nothing is re-typeset into a new template. Check every filled-in value before you download, print, or email it — same rule as everything else the robot fills in for you.
You did it. 🎉
Here is the exact order TotalBidder works a job, start to finish. Steps marked 🤖 automatic run by themselves; steps marked 👤 you need a person.
Once you're signed in, look for a small round button sitting in the bottom-right corner of the screen — that's the Bid Copilot. It stays with you on any bid. Click it and a chat panel opens where you can ask plain questions about the bid you're currently working on:
The Copilot answers using this bid's own live numbers — project info, disciplines, and the BOM you uploaded — it doesn't make numbers up. You can type or use the microphone button, and it can read answers back out loud with the speaker toggle.
If your bid is for a public-works job (school district, city, state, federal), you have a few extras to take care of. They're all under Admin → Compliance:
Many public bids require a percentage of certified small / minority / disadvantaged suppliers. Open DBE / SBE / MBE, list your suppliers and their cert types. The page turns green if you hit the goal, red if not.
The GC needs a Certificate of Insurance. Open COI Generator, fill in the GC's name and address, click Print Broker Request, and send it to your insurance broker.
Public bids usually need a bid bond (often 10% of the bid amount). Open Bid Bond — the amount is auto-calculated. Click Print Bond Request and email it to your surety agent.
After you win a CA public-works job, you have 5 days to send a DAS-140 form to the apprenticeship committee. Open DAS-140 / 142, click Generate Cover Letter, and mail it with the DAS form from dir.ca.gov.
This is almost always a column-header problem. Open your file and check:
Fix the headers and re-upload. Still off? Ask Tony before you send it.
Check whether your sheet has a separate Qty (run count) column alongside the Length column — TotalBidder multiplies the two into total footage. If your Qty column is really the total footage already, leave the run-count column blank so it isn't multiplied twice.
Make sure the file name or content makes it clearly a wage document (it should say things like "wage determination," "Davis-Bacon," or "prevailing wage"). If TotalBidder can't tell, it may be read as a take-off file instead. Re-upload it on its own if needed.
The robot is busy with other people's bids. Wait a few minutes and try again. It will still work — just a little slower.
You checked Audio Visual on Step 3 but your take-off doesn't have any AV lines in it. Go back to Step 3, uncheck Audio Visual, and try again.
Open Workbench → Dashboard and look at the breakdown. Then open the Discrepancies tab — it lists places where the priced BOM doesn't line up with your take-off (rows that didn't parse, labor-guard and wage anomalies). Ask Tony to look before you send it.
Click at the top, pick your project from the list, and everything comes back. TotalBidder auto-saves every few minutes — you almost never actually lose work.
Construction has its own language. Here's what the most common words mean:
| Word | What it means |
|---|---|
| Bid | The total price you give to the customer. |
| Proposal | The pretty Word document that contains the bid. |
| Take-off | The completed count of every device/material and cable length for a job — what you upload to TotalBidder to build the bid. |
| Plans | The drawings of the building (floor plans, ceiling plans, riser diagrams). TotalBidder doesn't read these directly — your take-off comes from them. |
| Specs | The rulebook for the building (the written part). |
| Wage Determination | A government document (Davis-Bacon or state prevailing-wage) listing required hourly pay rates by craft for a public job. |
| Addendum | An update to the plans or specs the architect sent after the original. |
| Solicitation | The official "we want bids" posting from a city/school/agency. |
| BOM | "Bill of Materials" — a list of every part needed. |
| GC | "General Contractor" — the company that builds the whole building. We bid TO them. |
| Owner | The customer who pays for everything (school district, hospital, etc.). |
| RFI | "Request For Information" — a written question you ask the GC when something's unclear. |
| Submittal | A package showing what brand of stuff you'll use, sent before installation. |
| Markup | The extra money added on top of cost. That's our profit. |
| Contingency | Money saved for "just in case" surprises. |
| Prevailing Wage | A higher hourly pay rate the government requires on public-works jobs. |
| NIC | "Not In Contract" — work that's NOT our job. |
| By Others / By EC | Another contractor (or the electrician) does this part, not us. |
| DBE / SBE / MBE | "Disadvantaged / Small / Minority Business Enterprise" — certified small suppliers public bids often require. |
| Scope | What the job covers (and what it doesn't). |
| CO | "Change Order" — when the job changes after work starts. Extra paperwork, extra money. |
| VE | "Value Engineering" — making the bid cheaper by changing what gets installed. |
| FACP | "Fire Alarm Control Panel" — the brain of the fire alarm system. |
| IDF / MDF | The closets / rooms where network equipment lives. IDF = small, MDF = big main one. |
The first bid takes the longest. The second is faster. By the fifth one, you'll feel like you've been doing this forever.
Everyone here was new once. Ask questions. Mess up. Fix it. That's how you learn.
Good luck.